You don't have javascript enabled. Good luck with that.
Pencarian
 42 Titik Lampu PJU Dipasang di Sepanjang KBB
.
photo TP Moan Simanjuntak - Beritajakarta.id

42 Street Lights Installed Along KBB

As many as 42 street lights are installed along West Flood Canal (KBB), West Jakarta.

Street light type is 90 watt. The effort is aimed to brighten the area

Joko Laksono, Head Section of Supervision and Handling for West Jakarta Sub-dept. of Industry and Energy, said the installation is started from Angke River up to Jalan Latumenten.

“Street light type is 90 watt. The effort is aimed to brighten the area,” he said, Wednesday (9/7).

89,000 Lamps will Be Replaced with LED

According to him, street lights have been installed at the area. But the lights still using the old type, not LED.

“Previously, we have installed LED street lights along Jalan Daan Mogot starting from Tangerang border up to Cengkareng intersection by 28 spots,” he closed.

Linked News
Popular News indeks
  1. Rano Inspects Location and Delivers Aid to Fire Victims in Bukit Duri

    access_time20-07-2025 remove_red_eye379 personNurito
  2. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye359 personTiyo Surya Sakti
  3. Council Urges Free School Programs to Prioritize Principles of Fairness and Quality

    access_time18-07-2025 remove_red_eye331 personFakhrizal Fakhri
  4. Assistance Continues to Be Provided to Bukit Duri Fire Victims

    access_time20-07-2025 remove_red_eye330 personNurito
  5. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye329 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik